Forefront AE was selected by the City of Leesburg to provide complete design and engineering services for the Gas Department Operations Center. The project includes a substantial interior remodel and a new addition to improve functionality and aesthetics for long-term use.Forefront AE will deliver a remodel of 3,850 square feet of existing space and an addition of about 3,200 square feet for the City of Leesburg Gas Operations Center. The team provides integrated civil, architectural, structural, mechanical, electrical, plumbing, and fire protection design. Deliverables include signed and sealed construction drawings, complete AHJ submittals, and written responses to permitting comments through final approval.
The scope begins with a programming and needs assessment, followed by boundary, topographic, and tree surveys and geotechnical investigations. Forefront AE then advances the work through Schematic Design and Design Development, and prepares Construction Documents at 60 percent, 90 percent, and 100 percent. The team supports the permitting phase to keep the project moving into construction.
Originally starting back in 1994, Lindemann, Bentzon, and Bojack gained a reputation as one of the most highly respected firms earning a solid notoriety for completing projects ahead of schedule and below budget. In 2014 Forefront arose from Lindemann, Bentzon, and Bojack and have continued on their legacy maintaining the old relationships while garnering new ones. Today, Our extensive experience spans a wide range of projects, ensuring that we bring both depth and breadth of knowledge to every engagement.